Free QA resource
Release readiness checklist
The 17 must-pass checks to review before any release goes live, free to copy. For release test plans, run progress and sign-off that the whole team can see, use TestLinkPro.
Free example
The must-pass release go/no-go checks
Seventeen must-pass checks for a release go/no-go meeting. Add an owner, a status and a link to evidence for each one.
Release Go/No-Go Checklist
Use in the go/no-go meeting before a production release, after testing is complete. MUST = required before release (or explicitly accepted).
Scope & build
- MUSTThe release scope is frozen, and every ticket in the release is listed (fix version, release notes draft or PR list).
- MUSTThe release candidate is identified (tag, build number or commit SHA), and it is the exact build that was tested.
- MUSTAll code for the release is merged, reviewed and has passed CI (unit, integration and other required checks).
Testing status
- MUSTPlanned testing of in-scope features is complete, or the gaps are documented and accepted by the release owner.
- MUSTThe regression suite was run on the release candidate; results are reviewed and every failure is triaged.
- MUSTThe smoke test passed on staging or pre-production.
Defects & risk
- MUSTThere are no open Critical or Blocker defects against the release.
- MUSTEvery open High/Major defect has an agreed decision: fix now, defer with a workaround, or accept the risk.
- MUSTKnown issues are documented, with workarounds, for support and the release notes.
Deployment readiness
- MUSTA deployment plan or runbook is written and reviewed, with the order of steps and the expected duration.
- MUSTA rollback plan exists and has been tested or rehearsed, including database changes.
- MUSTDatabase migrations were tested on a production-like copy and are backward compatible, or a plan covers the gap.
- MUSTProduction configuration, feature flags, secrets and environment variables are prepared and checked.
Operations & support
- MUSTMonitoring, dashboards and alerts are in place for new and changed features.
- MUSTOn-call and hotfix owners are named and available during and after the release.
Sign-off
- MUSTQA sign-off is recorded, including any conditions.
- MUSTEngineering and product sign-offs are recorded.
Run your next release in TestLinkPro
Release test plans, test runs with evidence and a live go/no-go view, in subscription test-management software built for QA teams. Free for up to 5 users.